Ongoing

WRPC Boiler 3 Project

WRPC Boiler Project
  • Service: Instrumentation/automation interphase works
  • Location: WRPC
  • Client: LEE Engr.
  • Timeline: Jan 2025 - Present
  • Ongoing

    OML 34 AMT Maintenance Project

    OML 34 Maintenance
  • Service: Maintenance, servicing and replacement of Mechanical, instrument, electrical and demo equipment
  • Location: SITP lab NEPL/ND western Estate Edjeba
  • Client: CHIzE Venture/ND Western
  • Timeline: Dec 2023 - Present
  • Ongoing

    EFE Early Production Facility (EPF)

    EFE Production Facility
  • Service: Engineering procurement, construction, installation, and commissioning (EPCIC) of early production facility
  • Location: OML 152
  • Client: EPCM/NEWCROSS petroleum Ltd.
  • Timeline: Sept 2023 - Present
  • Completed

    BAT Plant Calibration Project

    BAT Plant Calibration
  • Duration: June 2023
  • Service: Calibration of 250 pcs pressure and temperature gauges
  • Location: BAT plant Ibadan
  • Client: Bureau Veritas Nig. Ltd
  • Completed

    Gas Deliverability Testing Project

    Gas Deliverability Testing
  • Duration: May 2023
  • Service: Design installation and commissioning of gas deliverability testing project
  • Location: NAG 1, Utorogu gas plant, Ughelli
  • Client: NPDC/Nd western (Urhodo Nig Ltd)
  • Completed

    PLC Control Panel & SCADA System

    AXEELA PLC Project
  • Duration: Jan - Sept 2023
  • Service: Design, construction, installation and commissioning of PLC control panel and SCADA system for AXEELA
  • Location: Trans Amadi, Port-Harcourt
  • Client: AXEELA (EPCM)
  • Completed

    ATA 6 Fire & Gas System

    ATA 6 Fire & Gas System
  • Duration: Sept-Oct 2022
  • Service: Design and installation of fire and gas system on ATA 6 oil platform (Tenoil Ltd)
  • Location: ATA 6 Platform Eket
  • Client: EPCM
  • Completed

    Oziengbe Flow Station TAM

    Oziengbe Flow Station
  • Duration: March - April 2022
  • Service: Turn Around Maintenance at Oziengbe Flow station
  • Location: Oziengbe, Ajoki
  • Client: Enageed Services Ltd
  • Completed

    Ughelli Gas Manifold Revamp

    Ughelli Gas Manifold
  • Duration: July-Oct 2021
  • Service: Revamping of Ughelli Gas Manifold(GMD)
  • Location: Ughelli East and West
  • Client: Gaboga/NPDC
  • Completed

    Ejelebe Platform Asset Integrity

    Ejelebe Platform
  • Duration: July - Sept 2020
  • Service: Asset integrity Retrofitting and Calibration work
  • Location: Ejelebe Platform
  • Client: ATLAS Petroleum
  • Completed

    Ogini 3-Phase Separator

    3-Phase Separator
  • Duration: Feb - April 2019
  • Service: Design and installation of 3-Phase separator
  • Location: Ogini
  • Client: OGINI
  • Completed

    WRPC Control System Modernization

    WRPC BMS Upgrade
  • Duration: June 2018
  • Service: Upgrade/modernization of distributed control system BMS
  • Location: Warri Refinery and petrochemical company Ltd (WRPC)
  • Client: Yokogawa WRPC
  • Completed

    Utorogu Control Room UPS

    Utorogu UPS System
  • Duration: Jan-24 2018
  • Service: Rehabilitation of uninterrupted power supply system serving the control room at Utorogu
  • Location: Otorogu Gas plant
  • Client: NPDC Gaboga Inds. Ltd/NPDC
  • Completed

    WRPC Heat Recovery System

    WRPC HRSG Project
  • Duration: Oct - Dec 2016
  • Service: Rehabilitation of Heat Recovery system generators HRSG 01/02
  • Location: Warri Refinery and petrochemical Company Ltd. (WRPC)
  • Client: INVENSYS Limited
  • Completed

    Well Test Measurement Systems

    Well Test Measurement
  • Duration: Nov-03 2017
  • Service: Emergency provision and installation of manual well test measurement devices on test separator at ughelli east flow station
  • Location: Ughelli East Flow station NPDC
  • Client: Gaboga Inds. Ltd/NPDC
  • Completed

    OML 30 Test Measurement Systems

    OML 30 Test Separators
  • Duration: Dec. 2016
  • Service: Provision and installation of manual head test measurement devices on test separators at Eriemu, Oroni and Oweh flow station in OML 30
  • Location: OML 30
  • Client: NPDC Gaboga Inds. Ltd/NPDC
  • Completed

    PHRC Tank Gauges Rehabilitation

    PHRC Tank Gauges
  • Duration: Aug 2015 - May 2016
  • Service: PHRC Tank gauges rehabilitation system
  • Location: Port-Harcourt Refinery (PHRC)
  • Client: XAPON Limited
  • Completed

    Niger Blossom Rig Maintenance

    Niger Blossom Rig
  • Duration: 2015 - 2019
  • Service: Maintenance of all instrument installation in Niger Blosson Rig 101
  • Location: Different locations
  • Client: Tecon Oil Services Limited
  • Completed

    OML 34 Flow Meter Installation

    OML 34 Flow Meters
  • Duration: Feb-14
  • Service: Engineering design and modification of flow Meter installation on all test separators Of OML 34 station
  • Location: OML 34
  • Client: NPDC Gaboga
  • 25+

    Years Experience

    100+

    Projects Completed

    50+

    Client Companies

    15+

    Industry Sectors

    ×